You need all the different food groups and tech in the diet’, says Olivier Terneaud, Vice President, offshore wind, gas, renewables & power of the plan for Total to reach net zero by 2050.…
Danish wind turbine manufacturer Vestas has introduced the V236-15.0 MW offshore wind turbine.
With the world’s largest swept area exceeding 43,000 m2, the V236-15.0 MW delivers industry-leading…
Total has bought a 20 per cent stake in the EolMed floating wind pilot project in France, located in the Mediterranean Sea, off the coast of Gruissan and near Port-La-Nouvelle.
The 30 MW EolMed will…
Wind turbines already have a recyclability rate of 85% to 90%. Making turbines 100% recyclable is an important task for the wind industry – and we are making significant progress in the right…
Vestas plans to eliminate non-recyclable waste from the manufacturing, operation and decommissioning of its wind turbines by 2040, becoming the first turbine maker to announce such a target.
The…